p/z vs cumulative gas
The plot most reserves are booked from. A water drive or overpressure bends it slowly, so an early straight line can run well past the true gas in place.
Cole plot
F / E against cumulative gas. Flat at G = volumetric. Rising = strong water drive. Rising, then falling back = limited water drive. Falling from the start without the expansion term = overpressure.
Energy plot
Underground withdrawal F against total expansion E on log scales. A volumetric reservoir follows a unit-slope line: every barrel withdrawn is paid for by expansion. Water influx supplies energy the expansion term does not explain, lifting the points above that line.
Pressure check
Reservoir pressure against cumulative gas for the same reservoir under each drive. A strong aquifer holds pressure up. If a shut-in survey comes back far below that line, the aquifer is not keeping up.
From the field. A shut-in Gulf of Mexico gas field had been written off as watered out: the operator assumed a strong water drive, produced it hard, and shut the wells in when water reached them. A single bottomhole pressure survey came back sub-normal, not near-virgin. Energy-plot analysis showed a limited water drive. The cleaned-up well came back at 1.2 MMcf/d with no water, and new reserves were booked. Load the Limited water drive case and compare its pressure with the strong-drive line to see why that one survey mattered.
Survey table
Method and references
Material balance for a dry gas reservoir with water influx and rock and water expansion: F = G·(Eg + Efw) + We, where F = GpBg + WpBw, Eg = Bg − Bgi and Efw = Bgi(cwSwi + cf)Δp/(1 − Swi). Gas deviation factor from Hall-Yarborough with Sutton pseudo-critical properties. Example cases use a Fetkovich aquifer, stepped monthly at constant gas rate; water production is not modeled in the examples.
Cole plot after Cole (1969); the modified form with rock and water expansion and the energy plot follow Pletcher, "Improvements to Reservoir Material-Balance Methods," SPE Reservoir Evaluation & Engineering (2002). Compressibility-corrected p/z after Ramagost and Farshad (1981). Early-time overstatement of gas in place in abnormally pressured reservoirs: Hammerlindl (1971).
This is a screening tool, not a reservoir study. Average-pressure quality controls everything here: one bad survey can mimic a drive mechanism. Confirm with well-level data, offset performance and a full material balance or simulation before booking reserves.