Pressure: when does it stop flowing?
Rates over time
Lift method screen
| Method | When flow stops | Five years later | Why |
|---|
What the timing is worth
| Install | Oil after flow stops, Mbbl | NPV10, $MM | vs. on time |
|---|
Before lift is installed, a loaded-up well makes only the share of its rate set under "Loaded-up rate". Installing early also adds the drawdown uplift from the day it goes in (half the uplift for gas lift, which cannot draw a well down as far as a pump). NPV is the well's remaining value from today at 10%, after lift capital and operating cost, run to its economic limit.
How it works: oil follows an Arps hyperbolic decline to a terminal decline, water cut climbs to its final value, and reservoir pressure falls in proportion to cumulative oil. The well flows while the bottomhole pressure the reservoir can deliver at the current liquid rate (reservoir pressure minus rate over PI) stays above the pressure needed to lift the column to the wellhead. Column weight uses a screening gas-lightening factor based on gas-liquid ratio. Lift limits are published rules of thumb (rod capacity falls with depth; plunger needs about 400 scf/bbl per 1,000 ft). Replace the example inputs with your own well and check any real decision with nodal analysis.