Critical rate by method
The spread between methods is normal. They make different assumptions about cone shape and drainage, so treat the range, not any one number, as the answer.
Oil rate and water cut over time
Rate sensitivity
| Oil rate, BOPD | Breakthrough (S-C) | Breakthrough (B-J) | Producing life | Cum. oil, MBO | Cum. water, MBW | PV10, $M |
|---|
Each row holds the oil rate until water arrives, then holds total fluid rate while water cut climbs, until the recoverable oil is produced, the well reaches its economic limit, or 30 years pass. The shaded row is your plan; the italic row is the selected critical rate. Two things this screen does not capture: whether the well can deliver the higher rates at all (check with Nodal Analysis), and oil left behind when water fingers through a heterogeneous reservoir at high rates, which can lower ultimate recovery and narrow the advantage of producing fast.
How it works: critical rate uses Meyer-Gardner, Chaperon and Schols for a vertical well partially penetrating the top of an oil column over bottom water, and Chaperon's horizontal-well method for comparison. Breakthrough time uses Sobocinski-Cornelius or Bournazel-Jeanson with the water-oil mobility ratio from end-point relative permeabilities. After breakthrough, water cut follows the Kuo-DesBrisay correlation, climbing toward a limit set by the oil and water column thicknesses and mobility ratio. The forecast assumes a strong bottom-water drive holds pressure (no depletion decline) and caps recovery at the recoverable oil in the drainage area. Real wells cone faster through fractures and high-permeability streaks and slower across shale barriers, so use this to frame the decision, then confirm with a well test and offset performance. Equations follow Ahmed, Reservoir Engineering Handbook, Ch. 9. Next steps: Nodal Analysis for what the tubing can lift, and Lift Selection & Timing once water cut climbs.